Increased mobilization of resources through CIFFC is required to support operations in the active agencies. Agency priorities may need to be considered as a necessary measure to address the demand for shared resources among multiple active agencies. There is a moderate probability that drawing down resources from non-active agencies may pose a risk should existing conditions change.
Significant wildland fire activity is occurring in one or more agencies, with incident management (IMTs) actively engaged.
Demand and mobilization of interagency resources through CIFFC is moderate to high.
Potential for emerging significant wildland fires is normal for time of year.
Data provided based on information collected from agencies. Accuracy varies based on individual agency practices, but is typically considered to be rough estimates for daily operations. Final quality control is performed post-season and compiled in other publications.
Heavy IA workload with successful initial fire suppression. There has been an increase in fire behavior resulting in a small number of fires requiring additional resources. Currently there are three IMT's deployed.
For current year from January 1.
New Wildland Fires Yesterday
Agency
Natural
Human
Undetermined
Total
BC
24
7
0
31
YT
0
0
0
0
AB
4
3
1
8
NT
0
0
0
0
SK
0
1
0
1
MB
1
1
0
2
ON
0
2
0
2
QC
0
1
0
1
NL
0
0
0
0
NB
0
0
0
0
NS
2
0
0
2
PE
0
0
0
0
PC
0
0
0
0
Total
31
15
1
47
Full Response
Agency
OC
BH
UC
Total
Hectares
OUT
Hectares
Total
Hectares
BC
35
14
33
82
10,942.7
396
1,468.2
478
12,410.9
YT
173
16
15
204
175,113.3
67
90.3
271
175,203.6
AB
0
15
20
35
98,286.1
688
13,400.2
723
111,686.3
NT
1
0
2
3
22,001.6
50
455.4
53
22,457.0
SK
0
0
0
0
0.0
49
2,788.4
49
2,788.4
MB
3
3
7
13
10,441.8
59
409.8
72
10,851.6
ON
1
1
0
2
0.7
166
2,412.9
168
2,413.6
QC
0
0
0
0
0.0
308
231.8
308
231.8
NL
2
2
1
5
1,948.7
58
769.9
63
2,718.6
NB
0
0
0
0
0.0
165
131.8
165
131.8
NS
0
0
0
0
0.0
106
3,366.0
106
3,366.0
PE
0
0
0
0
0.0
2
0.3
2
0.3
PC
0
1
2
3
8.1
61
24.6
64
32.7
Total
215
52
80
347
318,743.0
2175
25,549.6
2522
344,292.6
Modified Response
Agency
Active
Out
Total
Hectares
BC
2
6
8
11,298.6
YT
0
0
0
0.0
AB
0
0
0
0.0
NT
5
2
7
7,170.5
SK
20
225
245
214,321.0
MB
5
9
14
54,100.4
ON
0
0
0
0.0
QC
0
6
6
3,579.9
NL
0
0
0
0.0
NB
0
0
0
0.0
NS
0
0
0
0.0
PE
0
0
0
0.0
PC
1
0
1
0.1
Total
33
248
281
290,470.5
Monitored Response
Agency
Active
Out
Total
Hectares
BC
0
12
12
510.3
YT
0
0
0
0.0
AB
0
0
0
0.0
NT
71
53
124
331,577.5
SK
0
8
8
1.7
MB
22
9
31
69,394.1
ON
1
0
1
1.5
QC
0
10
10
25,761.6
NL
0
0
0
0.0
NB
0
0
0
0.0
NS
0
0
0
0.0
PE
0
0
0
0.0
PC
20
1
21
6,596.9
Total
114
93
207
433,843.6
Grand Totals
Agency
Fires
Hectares
BC
498
24,219.8
YT
271
175,203.6
AB
*723
111,686.3
NT
184
361,205.0
SK
302
217,111.1
MB
117
134,346.1
ON
169
2,415.1
QC
324
29,573.3
NL
63
2,718.6
NB
165
131.8
NS
106
3,366.0
PE
2
0.3
PC
*86
6,629.7
Total
3010
1,068,606.7
* Totals include fires from last fire season that are still listed as active. Please refer to the agency’s own website for more information.
Prescribed Fires
Agency
Active
Out
Total
Hectares
BC
0
0
0
0.0
YT
0
9
9
15.1
AB
0
7
7
845.6
NT
0
0
0
0.0
SK
0
0
0
0.0
MB
0
0
0
0.0
ON
0
1
1
65.0
QC
0
0
0
0.0
NL
0
0
0
0.0
NB
0
0
0
0.0
NS
0
0
0
0.0
PE
0
0
0
0.0
PC
0
12
12
1,807.6
Total
0
29
29
2,733.3
Agency
Fire
Location
SOC
Size
BC
2022-K50863
49.37, 119.82
OC
2,264.0
BC
2022-K70580
50.24, 121.6
OC
3,057.0
Agency
APL
BC
3
YT
1
AB
2
NT
1
SK
1
MB
3
ON
2
QC
1
NL
3
NB
1
NS
2
PE
1
PC
2
Level 1
Level 2
Level 3
Level 4
Level 5
Agency Fire Danger
Low
Moderate
High
Very High
Extreme
Current Fire Load
Low
Moderate
High
Very High
Extreme
Anticipated Fire Load (7 Days)
Low
Moderate
High
Very High
Extreme
Agency Resource Levels
Adequate
Adequate
Some Assistance
Assistance Required
Inadequate
Agency's Ability to Respond to CIFFC Resource Requests
Excellent
Good
Moderate
Poor
No Ability
Potential for International Assistance
Nil
Nil
Nil
Increasing
Consideration
Item
BC
YT
AB
NT
SK
MB
ON
QC
NL
NB
NS
PE
PC
CIFFC
Intl
Total
Personnel
FF1 (IA)
0
0
0
0
0
39
0
0
0
0
0
0
0
0
0
39
FF1 (SA)
0
0
97
0
0
0
0
0
0
0
0
0
0
0
0
97
Overhead (General)
1
0
13
0
0
5
0
0
0
0
0
0
0
0
0
19
Item
BC
YT
AB
NT
SK
MB
ON
QC
NL
NB
NS
PE
PC
CIFFC
Intl
Total
Personnel
FF1 (IA)
0
0
0
0
0
0
39
0
0
0
0
0
0
0
0
39
FF1 (SA)
38
0
0
0
0
0
0
59
0
0
0
0
0
0
0
97
Overhead (General)
3
0
3
0
0
0
5
8
0
0
0
0
0
0
0
19
3
Mobilization of resources nationally is required to sustain incident management operations in the active Geographic Areas (GA's). National priorities established as a necessary measure to address the heavy and persistent demand for shared resources among active GA's.
Significant wildland fire activity is occurring in multiple geographic areas, with Incident Management Teams (IMTs) actively engaged.
Mobilization of resources through the National Interagency Coordination Center is moderate to heavy.
Potential for emerging significant wildland fires is normal for the time of year.