National mobilization is heavily committed and increased measures need to be taken to support agencies. Active agencies may take emergency measures to sustain incident operations. Inactive/low activity agencies are at drawdown levels.
Full commitment of national resources is ongoing.
Demand for interagency resources through CIFFC is extreme.
National availability of resources is limited, international resources are being mobilized.
Potential for emerging significant wildland fires is high to extreme and expected to remain so in one or multiple agencies.
Data provided based on information collected from agencies. Accuracy varies based on individual agency practices, but is typically considered to be rough estimates for daily operations. Final quality control is performed post-season and compiled in other publications.
Fire starts stabilizing and assigning resources to high priority incidents. Ridge rebuilding over majority of province over the next few days.
Fires in past 7 days 88.
For current year from January 1.
New Wildland Fires Yesterday
Agency
Natural
Human
Undetermined
Total
BC
4
1
3
8
YT
0
0
0
0
AB
1
1
4
6
NT
6
0
0
6
SK
6
0
0
6
MB
9
2
0
11
ON
9
3
0
12
QC
0
0
2
2
NL
0
0
0
0
NB
0
0
0
0
NS
0
0
0
0
PE
0
0
0
0
PC
0
0
0
0
Total
35
7
9
51
Full Response
Agency
OC
BH
UC
Total
Hectares
OUT
Hectares
Total
Hectares
BC
125
43
87
255
388,904.7
971
5,484.8
1226
394,389.5
YT
2
0
2
4
56.7
28
14.9
32
71.6
AB
2
17
34
53
48,426.3
845
2,002.7
898
50,429.0
NT
13
0
6
19
7,174.3
38
126.0
57
7,300.3
SK
25
0
5
30
101,016.1
89
4,240.5
119
105,256.6
MB
17
5
23
45
314,093.3
182
58,520.4
227
372,613.7
ON
51
9
29
89
93,503.3
751
10,924.9
840
104,428.2
QC
0
1
2
3
16.1
442
7,678.6
445
7,694.7
NL
0
0
0
0
0.0
57
306.3
57
306.3
NB
0
0
0
0
0.0
148
307.0
148
307.0
NS
0
0
0
0
0.0
110
197.1
110
197.1
PE
0
0
0
0
0.0
1
0.1
1
0.1
PC
0
0
2
2
0.8
32
41.7
34
42.5
Total
235
75
190
500
953,191.6
3694
89,845.0
4194
1,043,036.6
Modified Response
Agency
Active
Out
Total
Hectares
BC
0
0
0
0.0
YT
6
0
6
23,665.0
AB
0
0
0
0.0
NT
5
3
8
18,945.3
SK
136
204
340
491,056.1
MB
24
14
38
170,217.4
ON
7
3
10
343,218.3
QC
0
9
9
802.7
NL
0
0
0
0.0
NB
0
0
0
0.0
NS
0
0
0
0.0
PE
0
0
0
0.0
PC
1
0
1
0.0
Total
179
233
412
1,047,904.8
Monitored Response
Agency
Active
Out
Total
Hectares
BC
0
0
0
0.0
YT
59
2
61
48,218.5
AB
0
0
0
0.0
NT
47
1
48
16,597.2
SK
1
0
1
0.0
MB
70
13
83
79,888.0
ON
49
6
55
80,505.7
QC
3
12
15
20,817.4
NL
0
0
0
0.0
NB
0
0
0
0.0
NS
0
0
0
0.0
PE
0
0
0
0.0
PC
12
1
13
15,172.4
Total
241
35
276
261,199.2
Grand Totals
Agency
Fires
Hectares
BC
1226
394,389.5
YT
99
71,955.1
AB
*898
50,429.0
NT
113
42,842.8
SK
460
596,312.7
MB
348
622,719.1
ON
*905
528,152.2
QC
469
29,314.8
NL
57
306.3
NB
148
307.0
NS
110
197.1
PE
1
0.1
PC
48
15,214.9
Total
4882
2,352,140.6
* Totals include fires from last fire season that are still listed as active. Please refer to the agency’s own website for more information.
Prescribed Fires
Agency
Active
Out
Total
Hectares
BC
0
0
0
0.0
YT
0
0
0
0.0
AB
0
0
0
0.0
NT
0
0
0
0.0
SK
0
0
0
0.0
MB
0
0
0
0.0
ON
0
3
3
98.7
QC
0
0
0
0.0
NL
0
0
0
0.0
NB
0
0
0
0.0
NS
0
0
0
0.0
PE
0
0
0
0.0
PC
0
14
14
600.0
Total
0
17
17
698.7
Agency
Fire
Location
SOC
Size
BC
Brenda Creek (K51924)
, 0
OC
824.0
BC
Flat Lake (C41602)
, 0
OC
32,194.0
BC
Michaud Creek (N51765)
, 0
OC
4,600.0
BC
Nk'Mip Creek (K52061)
, 0
OC
6,800.0
BC
Octopus Creek (N51800)
, 0
OC
11,444.0
BC
Thomas Creek (K51794)
, 0
OC
6,960.0
BC
White Rock Lake (K61884)
, 0
OC
8,702.0
ON
KEN_FIRE_051
50.69, 95.02
OC
139,116.0
ON
RED_FIRE_016
51.39, 94.92
OC
120,786.7
ON
RED_FIRE_051
52.57, 94.82
OC
51,926.0
ON
RED_FIRE_065
52.02, 94.63
OC
17,309.5
ON
RED_FIRE_077
50.94, 94.55
OC
23,404.9
ON
SLK_FIRE_060
51.69, 92.08
OC
1,487.2
Agency
APL
BC
5
AB
2
NT
2
SK
4
ON
5
QC
1
NL
2
NB
1
NS
1
PE
1
PC
3
Level 1
Level 2
Level 3
Level 4
Level 5
Agency Fire Danger
Low
Moderate
High
Very High
Extreme
Current Fire Load
Low
Moderate
High
Very High
Extreme
Anticipated Fire Load (7 Days)
Low
Moderate
High
Very High
Extreme
Agency Resource Levels
Adequate
Adequate
Some Assistance
Assistance Required
Inadequate
Agency's Ability to Respond to CIFFC Resource Requests
Excellent
Good
Moderate
Poor
No Ability
Potential for International Assistance
Nil
Nil
Nil
Increasing
Consideration
To
Resources
From
MB
1 20p Type 1 Sustained Action Crew 1 Agency Representative
NB
ON
1 19p Type 1 Sustained Action Crew 2/4p Type 1 Initial Attack Crews 1 Agency Representative
AB
CIFFC
1 Technical Specialist
AB
BC
1/18p Type 1 Sustained Action Crew
AB
Item
BC
YT
AB
NT
SK
MB
ON
QC
NL
NB
NS
PE
PC
CIFFC
Intl
Total
Aircraft
AT-802
3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3
AT-802 Amph
0
0
0
0
0
4
0
0
0
0
0
0
0
0
0
4
Birddog
2
0
0
0
0
1
0
0
0
0
0
0
0
0
0
3
CL-215
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
1
CL-215T
4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
CL-415
0
0
0
0
0
0
6
0
0
0
0
0
0
0
0
6
Equipment
1.5" hose
0
0
0
0
0
0
5440
126
0
0
0
0
0
0
0
5566
Pumps
0
0
0
0
0
0
160
0
0
0
0
0
0
0
0
160
Sprinkler Heads
0
0
0
0
0
0
488
0
0
0
0
0
0
0
0
488
Personnel
FF1 (IA)
16
0
0
0
0
8
8
0
0
0
0
0
0
0
0
32
FF1 (SA)
236
0
0
0
0
37
134
0
0
0
0
0
0
0
0
407
IMT1
32
0
0
0
0
0
0
0
0
0
0
0
0
0
0
32
IMT2
16
0
0
0
0
0
0
0
0
0
0
0
0
0
0
16
Overhead (General)
15
0
0
0
0
2
7
0
0
0
0
0
0
2
0
26
Item
BC
YT
AB
NT
SK
MB
ON
QC
NL
NB
NS
PE
PC
CIFFC
Intl
Total
Aircraft
AT-802
0
3
0
0
0
0
0
0
0
0
0
0
0
0
0
3
AT-802 Amph
0
0
0
4
0
0
0
0
0
0
0
0
0
0
0
4
Birddog
0
1
1
1
0
0
0
0
0
0
0
0
0
0
0
3
CL-215
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
1
CL-215T
0
0
4
0
0
0
0
0
0
0
0
0
0
0
0
4
CL-415
0
0
0
0
0
0
0
4
2
0
0
0
0
0
0
6
Equipment
1.5" hose
0
0
1166
0
0
0
0
3400
0
1000
0
0
0
0
0
5566
Pumps
0
0
0
0
0
0
0
125
0
10
25
0
0
0
0
160
Sprinkler Heads
0
0
288
0
0
0
0
200
0
0
0
0
0
0
0
488
Personnel
FF1 (IA)
0
0
24
0
0
0
0
0
0
0
0
0
8
0
0
32
FF1 (SA)
0
0
37
0
0
0
0
120
7
23
23
1
0
0
196
407
IMT1
0
0
15
0
0
0
0
0
0
0
0
0
17
0
0
32
IMT2
0
0
0
0
0
0
0
9
0
0
6
0
0
1
0
16
Overhead (General)
0
0
5
0
0
0
0
7
0
5
1
0
0
1
7
26
To
Resources
From
ON
9 pp Hand Crew
WI
From
Resources
To
ON
1 Ignition Specialist 1 3p Mixing Crew
QC
BC
1 Fire Investigator
NS
5
National mobilization is heavily committed and measures need to be taken to support GA's. Active GA's must take emergency measures to sustain incident operations.
Full commitment of national resources is ongoing.
Resource orders filled at NICC by specifically coordinating requests with GACCs as resources become available.
Potential for emerging significant wildland fires is high and expected to remain high in multiple geographic areas.